BLOG
Planning, margins and people
Practical notes for animation, VFX and game studios on planning the work, protecting margins and looking after teams.
Capacity planning template: can your studio take on a new project?
A capacity planning template for animation studios: the structure, the formulas and the method to know if you can take on a new project before you sign.
Team capacity planning in animation studios: see overload before it hits
Team capacity planning for animation studios: work out load and capacity by role, spot the overloaded comp team, and decide before the week overflows.
Animation production schedule: why nobody trusts it, and how to make it reliable
Animation production schedule: why the crew stops believing the file, what it should contain, and when it is time to leave the spreadsheet.
Whatdo with Autodesk Flow Production Tracking (ex-ShotGrid): margin and capacity above your tracker
Can you use Whatdo with Autodesk Flow, formerly ShotGrid? Yes: Flow tracks shots and assets, Whatdo shows capacity and margin across the slate.
Whatdo with ftrack: crew planning and margin above your tracker
Can you use Whatdo with ftrack? Yes: ftrack keeps tracking shots, versions and reviews, Whatdo books the crew and shows each project’s margin.
Whatdo with Kitsu: production planning above your tracker
Can you use Whatdo with Kitsu? Yes: Kitsu keeps tracking shots and assets, Whatdo plans the crew, the load and the margin across every project.
Project profitability in animation studios: know your margin before you sign
Project profitability for animation studios: the formula to know a margin before signing, and why your studio’s schedule changes the answer.
Resource planning for animation and VFX studios: which tool fits your situation?
Spreadsheet, AYON, Float, Flow Production Tracking, ftrack, Kitsu or Whatdo: which resource planning tool fits your studio. Prices checked 10 November 2026.