Whatdo with Autodesk Flow Production Tracking (ex-ShotGrid): margin and capacity above your tracker
Can you use Whatdo with Autodesk Flow, formerly ShotGrid? Yes: Flow tracks shots and assets, Whatdo shows capacity and margin across the slate.
In short
- Short answer: yes. Flow, formerly ShotGrid, keeps tracking shots, assets and reviews. Whatdo shows capacity and margin across every project, above it.
- No connection yet: the link between Whatdo and Flow is announced, with no date. Today you enter projects by hand or import a CSV.
- What Flow does well: Autodesk lists Resource Planning views to “assess capacity, workload, and balance resources”, from $33 a month on its US site.
- What Whatdo adds: each project’s margin, before signing and every week, and bids placed on the schedule before they exist in the tracker.
- Price model: Whatdo is priced per studio, with unlimited users. See how Whatdo is priced.
ShotGrid became Flow Production Tracking, and for most studios little else changed: same shots, same reviews, same Monday meeting. And the same question at the end of it: can we take the next project, and what will it earn?
Can you use Whatdo with Flow Production Tracking?
Yes: Flow keeps tracking shots, assets and reviews, and Whatdo shows capacity and margin above it, across every project and every bid.
Whatdo is production planning for animation, VFX and game studios. It does not track shots, assets or reviews, so your Flow pipeline stays untouched. Artists and supervisors keep working in Flow. Producers see the crew and the money in Whatdo.
There is no link between the two yet. It is announced, with no date. Today you enter projects in Whatdo by hand or import them from a CSV file.

Who does what: Flow or Whatdo?
Flow runs the pipeline and already plans resources; Whatdo ties that plan to money and to projects not signed yet.
| Question | Flow | Whatdo |
|---|---|---|
| Shots, assets, tasks and reviews | Yes | No |
| Capacity and workload by artist or department | Yes, Resource Planning views | Yes, by role and by week |
| A project’s margin, live, from the crew staffed | Not described by Autodesk | Yes |
| A bid tested on the schedule before signing | Not described by Autodesk | Yes, in dotted lines |
| Rates hidden from the crew | Check your permissions | Yes, enforced by the server |
| Price | From $33 a month (Autodesk US site) | Per studio, unlimited users |
Flow’s column is based on Autodesk’s product page, read on 10 November 2026. Whatdo’s column is Whatdo’s own statement.
What does Flow already show for planning?
Of the three trackers, Flow is the one whose planning views its vendor describes in most detail: Autodesk lists Resource Planning views to assess capacity and workload at several levels.
If those views answer your question, you may not need another tool. They first appeared in ShotGrid in 2021, as CG Channel reported at the time. Studios come to Whatdo for the next question: what does this plan cost, and what does it leave on each project? A capacity view says a department is full. It does not say whether the project filling it makes money.
Your spreadsheet does the margin very well until the plan moves every week. Then the figures always lag one meeting behind.
How do you work with Flow and Whatdo today?
Without a connection, set Whatdo up once from your slate and your rates, then update it each week.
- List running projects and pending bids, with their phases, dates and signed or quoted price.
- Enter them in Whatdo by hand, or import them from a CSV file.
- Staff each phase by role and by week, with each role’s daily cost.
- Place pending bids as trial projects, in dotted lines, to see where the crew would overflow.
- Keep shots, assets and reviews in Flow; update dates in Whatdo once a week.
What does the margin look like next to a capacity view?
The same busy quarter can hide one project that loses money.
What will change when the connection arrives?
Once the announced connection ships, projects and dates should come from Flow without being entered twice.
Until then, the weekly update takes a few minutes per project, and margins are calculated in Whatdo. No date is announced today. To see what each plan includes, read how Whatdo is priced.

Key terms
- Flow Production Tracking
- Autodesk’s production tracking and review software, formerly ShotGrid, used to follow shots, assets, tasks and reviews.
- Resource planning
- Deciding who works on which project each week, and checking that no person or department is booked beyond capacity.
- Trial project
- In Whatdo, a project placed on the schedule in dotted lines to test whether the crew can absorb it, before it is confirmed.
- Margin
- The price signed for a project minus its real cost: crew days, freelancers and direct costs.
Frequently asked questions
Can I use Whatdo with Flow, formerly ShotGrid?
Yes. Flow, formerly ShotGrid, keeps tracking shots, assets, tasks and reviews. Whatdo sits above it and shows capacity and margin across all your projects.
Can Whatdo read my Flow or ShotGrid data?
Not yet. A link between the two is announced, with no release date. Today you enter projects in Whatdo by hand or import them from a CSV file.
Do I have to stop using Flow?
No. Whatdo does not track shots, assets or reviews. Flow stays your production tracker, and Whatdo plans people and money above it.
Flow already has resource planning. Why add Whatdo?
Autodesk lists Resource Planning views for capacity and workload. Whatdo adds what those views are not described as doing: each project’s margin from the people staffed on it, and bids tested on the schedule before signing.
How much does Flow cost?
Autodesk’s US site shows “Starting at $33 / month” on 10 November 2026, with a 30-day free trial. Check the plan you need under “Pricing options”.
Who sees the rates in Whatdo?
Only the people you allow. The crew can see their own week, but rates, costs and margins are never sent to them: the server enforces it, not just the screen.