Whatdo with ftrack: crew planning and margin above your tracker

Can you use Whatdo with ftrack? Yes: ftrack keeps tracking shots, versions and reviews, Whatdo books the crew and shows each project’s margin.

In short

  • Short answer: yes. ftrack keeps tracking shots, versions and reviews. Whatdo books the crew across every project and shows what each one earns.
  • No connection yet: the link between Whatdo and ftrack is announced, with no date. Today you enter projects by hand or import a CSV.
  • What ftrack does well: its Studio plan covers “Planning, scheduling and tracking”, with media review, from $25 per user a month billed annually.
  • What Whatdo adds: bookings by role and by week across the whole slate, overload seen weeks ahead, and the margin of a bid before you sign.
  • Who uses it: producers and heads of production. Artists stay in ftrack. See how Whatdo is priced.

The bid went out on Tuesday. The shots will live in ftrack once the job is won. But who will comp those 40 shots in March, when the current show is still delivering? That answer rarely sits in the tracker.

Can you use Whatdo with ftrack?

Yes: ftrack keeps tracking shots, versions and reviews, and Whatdo books the crew and shows each project’s margin above it, across the whole slate.

Whatdo is production planning for animation, VFX and game studios. It does not track shots, versions or client reviews, so your ftrack setup stays as it is. Artists keep working in ftrack. Producers book the crew and follow the money in Whatdo.

The two tools are not linked yet. The connection is announced, with no date. Today you enter projects in Whatdo by hand or import them from a CSV file.

Try Whatdo for free.

On your own studio’s data, set up together.

Try it for free

Who does what: ftrack or Whatdo?

ftrack follows the work shot by shot; Whatdo follows the crew and the money week by week.

Question ftrack Whatdo
Status of a shot, a version, a review Yes No
Client review sessions Yes, clients join for free No
Bookings by role, across every project Check in your plan Yes
Overload by role, weeks ahead Check in your plan Yes
Margin of a bid before signing Not stated by ftrack Yes
Price $25 per user a month billed annually, $30 monthly Per studio, unlimited users

ftrack’s column is based on the ftrack pricing page, read on 10 November 2026. Whatdo’s column is Whatdo’s own statement.

What does ftrack already cover for planning?

ftrack schedules tasks and people inside each project, as part of its Studio plan.

That covers a lot once a job is running. The gap is earlier and wider: before the bid is signed, and across several shows at once. A bid built on 3 compositors means little if two of them are already booked on the current show.

Your spreadsheet does this very well until three shows overlap and two producers edit the same file.

How do you work with ftrack and Whatdo today?

Without a connection, set Whatdo up once from your current shows and bids, then update it each week.

  1. List the running shows and the bids awaiting an answer, with their phases and dates.
  2. Enter them in Whatdo by hand, or import them from a CSV file.
  3. Book each phase by role and by week: comp, FX, lighting, animation.
  4. Place each pending bid on the schedule as a trial project, in dotted lines.
  5. Keep shots, versions and reviews in ftrack; update dates in Whatdo once a week.

What does a bid look like once the crew is booked?

The margin of a bid changes the moment you compare it with the crew you really have.

What will change when the connection arrives?

Once the announced connection ships, shows and dates should flow from ftrack without being entered twice.

Until then, the weekly update takes a few minutes per show, and the bids stay in Whatdo, where the margin is calculated. No date is announced today. To see what each plan includes, read how Whatdo is priced.

Try Whatdo for free.

On your own studio’s data, set up together.

Try it for free

Key terms

ftrack
Production tracking and media review software used by VFX, animation and game studios to follow shots, tasks, versions and client reviews.
Bid
The quote a studio sends for a job, built from the shots, the days per shot and the daily cost of the crew.
Booking
Reserving a person or a role on a project for given weeks, before the tasks exist in the tracker.
Margin
The price signed for a project minus its real cost: crew days, freelancers and direct costs.

Frequently asked questions

Can I use Whatdo with ftrack?

Yes. ftrack keeps tracking shots, versions, tasks and reviews. Whatdo sits above it and plans the crew, the load and the margin across all your projects.

Can Whatdo read my ftrack data?

Not yet. A link between the two is announced, with no release date. Today you enter projects in Whatdo by hand or import them from a CSV file.

Do I have to stop using ftrack?

No. Whatdo does not track shots, versions or reviews. ftrack stays your production tracker, and Whatdo plans people and money above it.

Does ftrack do resource planning?

ftrack states its Studio plan covers “Planning, scheduling and tracking”. Check whether its views give you bookings by role across all projects, and the cost of those bookings.

What does Whatdo show that ftrack does not?

Each project’s margin, live, from the people actually staffed on it, and the weeks where a role is overbooked across the whole slate, before a new bid is signed.

Do artists need a Whatdo licence?

Whatdo is priced per studio, with unlimited users. Artists can see their own week in Whatdo; rates and margins are never sent to them.