Resource planning for animation and VFX studios: which tool fits your situation?
Spreadsheet, AYON, Float, Flow Production Tracking, ftrack, Kitsu or Whatdo: which resource planning tool fits your studio. Prices checked 10 November 2026.
In short
- Short answer: if your tracker already schedules tasks, start there. To book people, look at Float. For open source, Kitsu or AYON.
- For margins: to see capacity and margin across every project, Whatdo is one option. It sits above your tracker.
- The baseline: for one or two projects and one producer, a spreadsheet is enough.
- Prices: every price below was read on the vendor's own page on 10 November 2026. Flow now starts at $33 a month.
- Disclosure: we make Whatdo. It appears last, under the same rules, with its limits first. See how Whatdo is priced.
- Do you need a new tool at all?
- Which resource planning tool fits which situation?
- What does each resource planning tool cost to start?
- What does each tool do better, and what is the catch?
- Where do the sources disagree?
- Where does Whatdo fit, and where does it not?
- How was this page checked?
- Sources
- Frequently asked questions
Every studio has someone who keeps the real plan: a spreadsheet, a whiteboard, a tracker view nobody else opens. The question is rarely “which software is best” but which one fixes the problem you have now. This page maps situations to tools, with prices read on each vendor’s page.
We make Whatdo, planning software for animation, VFX and game studios that shows projects, people and margins on one screen. It appears last on this page, under the same rules as the others. This page is not an independent review. Spotted an error? Write to contact@whatdostudio.com.
Do you need a new tool at all?
Probably not if you run one or two projects at a time. A shared spreadsheet with one row per person and one column per week shows who is booked.
Your spreadsheet does this very well until several producers edit it, projects overlap, or you need a project’s margin before you sign it. Most production trackers also schedule tasks. Check what yours already does before buying another tool.

Which resource planning tool fits which situation?
The right tool depends on the problem: task dates, overbooked departments, booking people, open source or margins.
Situations mapped to each vendor’s own pages, checked 10 November 2026. We found no independent test for any row: try the trial on your own data.
| Your situation | Lean towards | Why (attributed) | Check before paying |
|---|---|---|---|
| One or two projects, one producer | Keep the spreadsheet | A grid of people by weeks covers it | Does it still work when two people edit it? |
| You track shots in ftrack or Kitsu and need task dates | Your current tracker | ftrack lists “Planning, scheduling and tracking” in Studio; CGWire says Kitsu lets you schedule projects | Whether its views show load across all projects |
| You need to see who is overbooked, by department | Flow Production Tracking or AYON Studio | Autodesk lists Resource Planning views to “assess capacity, workload”; AYON lists “Planning & scheduling” in Studio | AYON Studio is the tier with planning |
| You mostly book people, not shots | Float | Float bills “per scheduled person” and adds others as guests for free | Whether you also need shot or asset tracking |
| You want open source or self-hosting | Kitsu or AYON | CGWire calls Kitsu open source; AYON Pro is “Self-hosted or Cloud” | Who runs the server and the updates |
| A large crew makes per-seat pricing expensive | Float or Whatdo | Float charges scheduled people only; Whatdo states “Unlimited users on every plan” | Ask Whatdo for a written price |
| You want a project’s margin before signing | Whatdo or Float Pro | Whatdo lists “Margin tracking per project”; Float Pro connects “what’s scheduled to what’s earned” | Test with one past project |
| You need it connected to your tracker today | Not Whatdo | Whatdo states its Kitsu, ftrack and Flow connections “are coming” | Ask for a live demo on your tracker |
What does each resource planning tool cost to start?
Entry prices run from free (the spreadsheet) to €38 per user per month (AYON Studio), and only Whatdo prices per studio.
Prices as shown on each vendor’s page on 10 November 2026. Currencies are not converted. Tax is excluded unless stated.
| Product | Cost to start | Trial | The deciding limit |
|---|---|---|---|
| Spreadsheet | Free | n/a | No live view across projects |
| AYON | Pro €19 per user per month or €180 per year, 5-user minimum; Studio €38 or €360 | “Get started for free” | Planning is in Studio, not Pro |
| Float | Starter $7, Pro $12 per scheduled person per month | 30 days, no card | A people scheduler, not a shot tracker |
| Flow Production Tracking | From $33 per month (Autodesk US site) | 30 days | Plan details behind “Pricing options” |
| ftrack Studio | $25 per user per month billed annually, $30 monthly; tax added | First 14 days free | Per user |
| Kitsu | €20, €30 or €35 per user per month, billed annually | Two weeks | Per user in the cloud |
| Whatdo (made by us) | Per studio per month, price on request | Trial for new studios | Tracker connectors not shipped |
What does each tool do better, and what is the catch?
Each tool below is strong on one part of planning and weaker on another. Listed in alphabetical order.
AYON
AYON covers pipeline, production tracking and planning, and its Studio plan lists “Planning & scheduling” with unlimited users. The catch: planning sits in Studio, not in Pro, and Pro has a 5-user minimum.
Float
Float is a dedicated resource scheduler. You pay only for scheduled people; others join as guests for free. The catch: Float does not state that it tracks shots, assets or reviews.
Flow Production Tracking
Formerly ShotGrid, Flow tracks shots and assets and offers Resource Planning views by artist or department. The catch: it is a full tracker, so you buy the whole pipeline tool to get the planning views.
ftrack
ftrack states its Studio plan covers “Planning, scheduling and tracking”, with media review. The catch: it is priced per user, and the annual price is a third lower than the monthly one.
Kitsu
CGWire describes Kitsu as an open-source tracker built for animation, VFX and game studios, with project scheduling. The catch: cloud plans are priced per user and billed annually.
Where do the sources disagree?
One price moved since our first edition, and one page shows two prices.
| Topic | Claim 1 | Claim 2 | What you can test |
|---|---|---|---|
| Flow price | CG Channel, 2021: “$40/month” | Autodesk US site, 10 November 2026: “Starting at $33 / month” | Open “Pricing options” for the plan you need |
| ftrack Studio price | $25, “Billed annually” | $30 on the monthly tab | Switch the tab on the pricing page |
We found no vendor contradicting another vendor’s figures.
Where does Whatdo fit, and where does it not?
Whatdo fits studios that need capacity and margin across every project, above the tracker they already use.
Limits first. Whatdo does not track shots or assets. Its connections to Kitsu, ftrack and Flow are announced, not shipped. Whatdo states that it “plans people and money above” your tracker.
It fits two rows of the table above: a project’s margin before signing, and a large crew on per-seat pricing. It is priced per studio per month, with unlimited users, and hosted in France. Whatdo states that rates and margins are never sent to the crew. Everything in this section is Whatdo’s own statement.
How was this page checked?
Prices, limits and features were read on each vendor’s own page on 10 November 2026. Each quoted phrase was matched word for word against that page. Statements a vendor makes about itself are attributed to it. We did not test the products.
The panel covers the tools AI assistants and search results most often suggested for this question in our October 2026 sample (Flow, ftrack, Kitsu, AYON), one general resource scheduler (Float), the spreadsheet baseline, and Whatdo. Not included: TACTIC Resource (vendor site unreachable on our first check), Resource Guru and farmerswife (not read in this edition).
Changelog. 27 October 2026: first edition. 10 November 2026: prices checked again; Flow price read on Autodesk’s site.
Corrections and right of reply. If you represent a product listed here and a fact is wrong, write to contact@whatdostudio.com with the page that shows the correct fact. Verified errors are corrected within 7 days and noted in the changelog.
Sources
- AYON pricing, checked 10 November 2026
- Float pricing, checked 10 November 2026
- Autodesk Flow Production Tracking, checked 10 November 2026
- ftrack pricing, checked 10 November 2026
- Kitsu pricing, checked 10 November 2026
- CG Channel, Resource Planning views in ShotGrid, 28 September 2021

Key terms
- Resource planning
- Deciding who works on which project, week by week, and checking that no person or department is booked beyond its capacity.
- Production tracker
- Software that follows shots, assets, tasks and reviews through the pipeline, such as Flow Production Tracking, ftrack or Kitsu.
- Per-seat pricing
- A price charged for each user account, so the bill grows with the size of the crew who can see the plan.
- Capacity
- The working days a person or department can give in a period, after holidays and other projects.
Frequently asked questions
Is there a free resource planning tool for animation studios?
A spreadsheet is free. Kitsu is open source, but its cloud plans are paid. Every paid tool on this page offers a free trial, from 14 to 30 days.
Can ftrack or Kitsu do resource planning?
Both vendors say they schedule tasks. ftrack lists “Planning, scheduling and tracking” in its Studio plan, and CGWire says Kitsu lets you schedule projects. Check whether their views show load across all your projects, not one at a time.
Can Flow Production Tracking show capacity by artist?
Yes. Autodesk lists Resource Planning views to “assess capacity, workload, and balance resources”. Flow Production Tracking starts at $33 a month on Autodesk’s US site, with a 30-day free trial.
Which tools are priced per studio instead of per user?
Among the tools on this page, Whatdo states it is priced per studio, with unlimited users on every plan. AYON Studio lists unlimited users. The others are priced per user or per scheduled person.
Do I have to replace my production tracker to plan people?
No. Most trackers already schedule tasks. A planning tool such as Float or Whatdo sits next to or above the tracker, which keeps tracking shots and assets.
Which tool shows a project’s margin before signing?
Whatdo lists margin tracking per project on its 15 to 80 people plan. Float Pro states it connects “what’s scheduled to what’s earned”. Test either with one past project and compare to your real figures.