Whatdo with Kitsu: production planning above your tracker

Can you use Whatdo with Kitsu? Yes: Kitsu keeps tracking shots and assets, Whatdo plans the crew, the load and the margin across every project.

In short

  • Short answer: yes. Kitsu keeps tracking shots, assets and reviews. Whatdo plans people, load and margin across all your projects, above Kitsu.
  • No connection yet: the link between Whatdo and Kitsu is announced, with no date. Today you enter projects by hand or import a CSV.
  • What Kitsu does well: CGWire describes Kitsu as “the open-source production tracker for animation, VFX, and game studios”.
  • What Whatdo adds: the crew by role and by week, overload seen weeks ahead, and each project’s margin before you sign.
  • Price: Kitsu’s cloud plans start at €20 per user a month; Whatdo is priced per studio, with unlimited users. See how Whatdo is priced.

Your shots live in Kitsu. Your crew plan lives somewhere else: a spreadsheet, a whiteboard, the producer’s head. The question studios ask is simple: can Whatdo sit next to Kitsu without changing how the crew works?

Can you use Whatdo with Kitsu?

Yes: Kitsu keeps tracking shots, assets and reviews, and Whatdo plans people, load and margin above it, across every project.

Whatdo is production planning for animation, VFX and game studios. It does not track shots or assets, so nothing in your Kitsu pipeline changes. Artists keep their tasks and reviews in Kitsu. Producers plan the crew and the money in Whatdo.

There is no live connection between the two yet. It is announced, with no date. Today you enter projects in Whatdo by hand or import them from a CSV file.

Try Whatdo for free.

On your own studio’s data, set up together.

Try it for free

Who does what: Kitsu or Whatdo?

Kitsu answers “where is this shot?”, Whatdo answers “who is free in March, and what does this project earn?”.

Question Kitsu Whatdo
Status of a shot or an asset Yes No
Tasks, versions and reviews Yes No
Who works on which project, each week Per project Across all projects
Overload by role, weeks ahead Not stated by CGWire Yes
A project’s margin before signing Not stated by CGWire Yes
Rates hidden from the crew Not applicable Yes, enforced by the server
Price Per user, from €20 a month, billed annually Per studio, unlimited users

Kitsu’s column is based on CGWire’s own pages, read on 10 November 2026. Whatdo’s column is Whatdo’s own statement.

What does Kitsu already show for planning?

Kitsu schedules tasks inside each production, with dates and assignees.

CGWire says Kitsu lets you “Schedule projects, track progress and build production reports” (Kitsu pricing page, read on 10 November 2026). For one series at a time, that may be all you need. The limit appears when two productions share the same animators, or when a new project arrives before the current one ends.

Your spreadsheet does this very well until a second project wants the same people. Then someone rebuilds the plan by hand every Monday.

How do you work with Kitsu and Whatdo today?

Without a connection, you set up Whatdo once from your current slate, then keep it up to date each week.

  1. List the projects you run or are about to sign, with their phases and dates.
  2. Enter them in Whatdo by hand, or import them from a CSV file.
  3. Staff each phase by role and by week, with the people you really have.
  4. Keep tasks and reviews in Kitsu, as today.
  5. Once a week, update dates in Whatdo when a production slips in Kitsu.

What does it look like on a real slate?

Two overlapping productions are enough to show what a schedule per project cannot see.

What will change when the connection arrives?

Once the announced connection ships, projects and dates should no longer be entered twice.

Until then, the weekly update takes a few minutes per project. Whatdo will publish the connection when it is ready, with no date announced today. To compare Whatdo with other planning tools, read how Whatdo is priced and what each plan includes.

Try Whatdo for free.

On your own studio’s data, set up together.

Try it for free

Key terms

Kitsu
Open-source production tracker published by CGWire, used by animation, VFX and game studios to follow shots, assets, tasks and reviews.
Production tracker
Software that follows each shot or asset through the pipeline, task by task, until delivery.
Load
The work booked for a person or a role in a given week, compared with the time they actually have.
Slate
All the projects a studio runs or is about to sign, seen together.

Frequently asked questions

Can I use Whatdo with Kitsu?

Yes. Kitsu keeps tracking shots, assets, tasks and reviews. Whatdo sits above it and plans the crew, the load and the margin across all your projects.

Can Whatdo read my Kitsu data?

Not yet. A link between the two is announced, with no release date. Today you enter projects in Whatdo by hand or import them from a CSV file.

Do I have to stop using Kitsu?

No. Whatdo does not track shots or assets. Kitsu stays your production tracker, and Whatdo plans people and money above it.

Can Kitsu do resource planning on its own?

CGWire says Kitsu lets you schedule projects and track progress. Check whether its views show the load of every person across all your projects, not one project at a time.

What does Whatdo show that Kitsu does not?

The whole slate in one view: who is booked on which project each week, where a role is overloaded weeks ahead, and what each project earns before and during production.

How long does it take to start Whatdo next to Kitsu?

It depends on the number of projects and people. Whatdo sets the studio up with you, remotely, on your own data. New studios start with a free trial.

Lucille Achard
Lucille Achard

CTO and co-founder of Whatdo, planning software for animation, VFX and game studios. Lucille worked at Wētā Digital before founding Whatdo.